top of page

Floating mooring pontoons – Tulcea County

As part of a large river infrastructure project, our company delivered and installed 11 floating mooring pontoons , fully equipped with access walkways and groynes, in several localities in Tulcea County. These pontoons are designed for the safe mooring of fishing boats and contribute to the modernization of water access for local communities.

BENEFICIARY:

Astra București & CO Prod SRL, in collaboration with Tulcea County City Hall

1.JPG
  • Strategic distribution of pontoons in Tulcea County

    The pontoons were strategically placed in five key locations in Tulcea County – Partizani, Iliganii de Sus, Maliuc, Vulturu and Pardina – to facilitate the safe and efficient docking of fishing boats. These locations were selected to serve local communities and optimize access to the water.

    • Partisani – 3 Type 1 pontoons (PPT1)

    • Iliganii de Sus – 2 Type 1 pontoons (PPT1)

    • Maliuc – 2 Type 1 pontoons (PPT1)

    • Vulturu – 2 pontoons Type 1 (PPT1)

    • Pardina – 2 Type 2 pontoons (PPT2)

  • Advanced technical features for performance

    The pontoons are designed and built with high precision technical specifications, ensuring stability, buoyancy and operational safety. The dimensions and structure are optimized for efficient use, providing a safe platform for mooring and nautical activities.

    • Technical features

    • Overall length: 10.65 m

    • Maximum body length: 10.54 m

    • Float length: 9.08 m

    • Overall body width: 4.90 m

    • Maximum body width: 4.77 m

    • Float diameter: 1.30 m

    • Distance between floats: 1.36 m

    • Deck length: 9.07 m

    • Deck height: 1.50 m

    • Maximum body height: 2.50 m

    11.HEIC
  • Robust construction and guaranteed safety for long-term use

    The pontoons were manufactured in our own workshop in Bucharest (104 Berceni Street), according to the authorizations obtained and under the supervision of the ANR Giurgiu Technical Inspectorate.

    The cylindrical metal floats are compartmentalized (4 compartments), ensuring stability and buoyancy even in the event of an impact. Access to the pontoon is via walkways with a protective wooden beam, and the deck is delimited by safety railings.

    For energy efficiency, each pontoon is equipped with photovoltaic poles and panels, powering the lighting system and navigation signaling.

    6.JPG
  • Complete services, from design to installation

    • Design and execution of metal structure

    • Land and water transport

    • On-site installation

    • ANR (Romanian Naval Authority) compliance

    These pontoons are intended for mooring the boats of fishermen from local communities and support the development of transport and tourism infrastructure in the Danube Delta.

    6.JPG

Do you like this project?

Let's discuss your ideas. Our team can turn your concept into reality – quickly, safely and to the highest standards. Contact us for a personalized quote.

bottom of page